Bulli Point – Slip Repair
Project – Bulli Point Slip Repair
Contractor – Inframax Contractors
Engineers – WSP Opus
Date – 2020
This slip repair for NZTA at Bulli Point, Taupo used Redi-Rock Walls with soil anchors. WSP selected Redi-Rock knowing it had been used previously by NZTA to great effect. Inframax Contractors, Te Kuiti, report the installation process was efficient and the project was able to be completed prior to the lock down in NZ.